Installation process
How We Install Your Solar System, Step by Step
Six clear steps, about two weeks from quote to switch-on, and most homes installed in a single day by our own SAA-accredited team.
- 4.9★Google rating
- 1,500+Installations
- Since 2017Locally owned
- SAAAccredited installers
From First Call to Switch-On
- 1. Free quote & energy assessmentWe review your electricity bills and roof using satellite imagery or a free site visit, recommend a system size and send a written, fixed-price quote with a savings breakdown, usually within 24 hours.
- 2. System design & approvalOur designers lay out panels around your roof orientation and shading, then prepare and lodge the connection application with Ausgrid, Endeavour Energy or Essential Energy for you.
- 3. Installation schedulingNetwork approval typically takes 5–10 business days. Once approved, we book a time that suits your household, usually within 7–14 days of signing.
- 4. Installation dayOur SAA-accredited team installs panels, inverter, battery, mounting, wiring and metering in one day, with updates at each stage.
- 5. Certification & grid connectionWe issue a Certificate of Electrical Safety, submit the connection notice to your network and arrange a bidirectional meter if needed.
- 6. Monitoring & handoverWe set up the monitoring app, show you how to read it and hand over warranty certificates, compliance documents and manuals.

What to Expect, Day by Day
Here is a typical timeline from your first enquiry to a working system. Weather, stock supply and network or council approvals can occasionally add time, and we will always tell you if an estimate changes.
| When | Milestone |
|---|---|
| Day 1 | Free quote request submitted |
| Day 1–2 | Written proposal received |
| Day 3–5 | Agreement accepted and signed |
| Day 5–12 | Network approval |
| Day 7–14 | Installation scheduled |
| Installation day | System live, monitoring active |

A Typical Installation Day
Most homes are installed between morning and mid-afternoon. Here is how the day usually runs.
| Time | What happens |
|---|---|
| 7–8am | Team arrives, site safety briefing, equipment moved to the work area |
| 8–11am | Roof work: mounting rails fixed, panels secured and wired, conduit and DC cabling run |
| 11am–2pm | Inverter and battery mounted, AC wiring to the switchboard, isolators fitted to AS/NZS standards |
| 2–4pm | Commissioning, monitoring app set up and a personal walkthrough before the team leaves |
Power is switched off for about 15–30 minutes while the inverter is connected. We let you know beforehand.
Done Properly, Every Time
SAA-accredited installers
Every installation is completed by accredited, licensed electricians.
Sealed roof penetrations
Brackets are sealed with UV-stable sealant to keep your roof watertight.
Australian standards
Isolators, cabling and switchboard work completed to AS/NZS standards.
Clean site
All packaging and waste is removed when the job is finished.
Honest reporting
Any existing roof issues we find are reported to you immediately.
Full documentation
Certificates, compliance documents and warranty paperwork at handover.

Support That Continues After Switch-On
Your system is monitored through the inverter app, and our local after-care team is a phone call away. If anything goes wrong, we diagnose remotely first, then send a technician if needed, and we manage any manufacturer warranty claim for you.
How to Prepare for Your Installation
There is very little you need to do, but a few small things help the day run smoothly and keep the crew on schedule.
- Clear a path to the switchboard and the wall where the inverter and battery will go
- Make sure the crew can reach the roof safely, including side access and gates
- Secure pets and let neighbours know if access is shared
- Save work on computers before the short power-off window
- Have your electricity retailer account details handy for the meter change
Why Network Approval Comes First
Every grid-connected system needs approval from your electricity network before installation. The network checks that local infrastructure can handle your system and sets your export limit.
We prepare the technical documents and lodge the application with Ausgrid, Endeavour Energy or Essential Energy for you. Approval typically takes 5–10 business days. We then design the final layout to the approved limit, so your inverter never has to be turned down after installation.
Installation Questions
Do I need to be home during installation?
An adult needs to be home when the crew arrives and for the final handover. You don't need to be there all day, but the team needs access to the roof and switchboard area, and they will let you know when they are nearly finished.
How long does installation take?
Systems from 6.65kW to 13.3kW, including solar and battery systems, usually take 6–8 hours in a single day. Larger or complex installations, such as multi-storey homes, unusual roofs or 15.2kW systems, may take two days. Your installer confirms the expected duration before the booked date.
Will my power be turned off?
Yes, briefly. Power is usually off for 15–30 minutes while the inverter is connected to your switchboard, and you are told beforehand so you can save any work.
Will there be mess or roof damage?
Our installers wear rubber-soled footwear and follow strict roof protocols. Mounting brackets are sealed with UV-stable sealant, all waste and packaging is removed, and any existing roof issues we find are reported to you straight away.
When can I start using solar power?
Generation starts as soon as the system is switched on, and live data usually appears in the monitoring app within minutes. Feed-in credits appear on your next electricity bill.
Do I need a new meter?
Usually your existing meter is reconfigured or replaced with a bidirectional smart meter so exports can be measured. We submit the paperwork and your retailer arranges the meter change, which can take a few weeks after installation. Your system can still power your home in the meantime.
Can you install a battery on the same day as the panels?
Yes. When you choose a solar and battery package, panels, hybrid inverter and battery are installed together on the same visit, so there is no return trip and only one network application.
How long from quote to switch-on?
Network approval typically takes 5–10 business days, and most installations are booked within 7–14 days of signing. Weather, stock and network or council approvals can occasionally cause delays, and we keep you updated if they do.
Book Your Free Solar Assessment
Book a free site visit with our SAA-accredited team. We design a system for your roof and bill, apply the rebates and give you a written price with no obligation.
Mon–Fri 8am–6pm · Sat 9am–3pm
- No obligation, no pushy sales
- Fixed written price before any work
- Battery and STC rebates applied for you
- Installed by our own SAA-accredited team